Projects

Projects

# Project Completion
1
57 km, Kurdistan Gas Pipeline, size 24” – KAR Group Project
2009
2
Industrial Water Pipes - SIDCCO
2009
3
Construction of 6 storage Tanks - SIDCCO
2009
4
40 Km, Crude Oil Pipeline, size 20” from Khurmala Oil & Gas Field to Erbil refinery – KAR Group Project
2010
5
30 Km, GAS Pipeline, size 16” - Ahdeb Oil Field
2010
6
30 Km, Crude Oil Pipeline, size 10” - Ahdeb Oil Field
2010
7
Construction in total of 53 Km, Production Flow Lines, size 6” - Ahdeb Oil Field
2010
8
GAS Pipeline Size 16” & Crude Oil Pipeline Size 10”, 30KM each - Ahdeb Oil Field
2010
9
27 Crude Oil Production Flow lines, Total 118 Km - Rumaila Operating Organization / BP Iraq
2011-2012
10
Foam & Circulation Tanks Piping, size 12” in Total 13Km at DS04 - Rumaila Operating Organization / BP Iraq
2013
11
Dressing Production Manifold – 15 Slots at DS09 - Rumaila Operating Organization / BP Iraq
2013
12
Water Intake Pipeline, size 24” at K44 Total 11Km - Rumaila Operating Organization / BP Iraq
2014
13
Erection of 200 NOS of Crude Oil WH control Skids - Rumaila Operating Organization / BP Iraq
2015
14
7.5 Km Crude Oil Flex Line size 16”, from DS04 to DS05 - Rumaila Operating Organization / BP Iraq
2016
15
EPC Project for Mainpay Water Injection Manifold & 18 Slots Replacement for Five Cluster Pump Stations - Rumaila Operating Organization / BP Iraq
2017-2018
16
Crude Oil Trunk Line 18” to PM-400 & PM-300 at DS02 – Rumaila Operating Organization / BP Iraq
2018
17
43 Crude Oil Production Flow lines – Total 215 Km - Rumaila Operating Organization / BP Iraq
2014-2019
18
CPS6 Temporary Pumping Project – Weatherford / Rumaila Operating Organization / BP Iraq
2019
19
EPC Project for erection 12 Crude Oil Production & Field Manifolds – Rumaila Operating Organization / BP Iraq
2019
20
EPC QAIYARAH FLOW LINES INSULATION PROJECT - QAIYARAH OIL FIELD
2020