Contact center: (+964) 750 421 2870 - Email: info@baco-iraq.com


 

Projects (Previous & Present)
 

2016 BACO COMPLETED PROJECTS

 

FLOW LINES PROJECTS

 

No.

Project Name

Work Site Location

1

R-587 FL ( L-8.94 KM )

Rumaila

2

RU 338 FL ( L-4.58 KM )

Rumaila

3

RU 338 DS PART ( L-0.178 KM )

Rumaila

4

R- 152A FL (L-0.5 KM )

Rumaila

5

RU- 013 FL ( L 4.118 KM )

Rumaila

6

R - 458 FL ( L 3.15 KM )

Rumaila

7

RU - 381 FL ( L 1.075 KM )

Rumaila

8

RU - 381 DS part ( L 0.522 KM )

Rumaila

9

R- 183 FL ( L 5.272 KM )

Rumaila

10

R- 597 (HZ33) DS part ( L 0.084 KM )

Rumaila

11

R- 601 (IH 31 ) FL ( L 3.272 KM )

Rumaila

12

R- 601 (IH 31 )DS Part ( L 0.1 KM )

Rumaila

13

RU - 026 R.C

Rumaila

14

RU - 155 FL (4.86 km )

Rumaila

15

HV - 29 FL (2.31 KM )

Rumaila

16

HO - 25 FL (3.495 )

Rumaila

17

R - 183 MF (0.053 KM )

Rumaila

18

R - 458 MF ( 0.024 KM )

Rumaila

19

HR - 30 (R-604)DS PART (0.99 KM )

Rumaila

20

RU - 155 DS PART ( 0.137 KM )

Rumaila

21

HV - 29 DS PART (0.01 KM )

Rumaila

22

HO - 25 DS PART (0.102 KM )

Rumaila

 

 

WELLHEAD PROJECTS

 

No.

Project Name

Work Site Location

1

R-060

Rumaila

2

R-152 A

Rumaila

3

RU-338

Rumaila

4

R-589(GG31)

Rumaila

5

R-033

Rumaila

6

R-592

Rumaila

7

R-119

Rumaila

8

R-091

Rumaila

9

R-587 (EW-37)

Rumaila

10

R-466

Rumaila

11

R-593(GG 31)

Rumaila

12

R-594 (FF35)

Rumaila

13

R-595 (Fw29)

Rumaila

14

R-597 (HZ 33)

Rumaila

15

R-283

Rumaila

16

RU- 089

Rumaila

17

R-109

Rumaila

18

R-216

Rumaila

19

R-599 (IT 39)

Rumaila

20

R-458

Rumaila

21

R-111

Rumaila

22

R-110

Rumaila

23

R-77 WH

Rumaila

24

R-141 WH

Rumaila

25

R-104 WH

Rumaila

26

R-116 WH

Rumaila

27

R-128 WH

Rumaila

28

R-149 WH

Rumaila

29

R-608 WH

Rumaila

30

R-609 WH

Rumaila

31

R-601 (IH-31) WH

Rumaila

32

RU- 155 WH

Rumaila

33

R-192 WH

Rumaila

34

R- 604 (IH 30 ) WH

Rumaila

35

R- 604 (JB-37) WH

Rumaila

36

RU- 238 WH

Rumaila

37

R- 605 WH

Rumaila

38

R- 602 WH

Rumaila

 

 

WATER INJECTION PROJECTS

 

No.

Project Name

Work Site Location

1

R-115 WI WH

Rumaila

2

R- 183 WI WH

Rumaila

3

R- 289 WI WH

Rumaila

4

R- 105 WI WH

Rumaila

5

R- 146 WI WH

Rumaila


Completed projects in 2014 and 2015

 

WELLHEADS SECTION

 

No.

Project Name

Work Site Location

1

WELLHEAD R-089 PIPING WORK

North Rumaila

2

WATER INJECTION WELLHEAD R-147A

North Rumaila

3

WELLHEAD R-148 PIPING WORK

North Rumaila

4

WELLHEAD PIPING WORK FOR R-193

North Rumaila

5

MISHRIF REACTIVATION WELLHEAD R-223

North Rumaila

6

WATER INJECTION WELLHEAD WORK R-250

North Rumaila

7

WATER INJECTION CPS TIE-IN WELLHEAD R-414

North Rumaila

8

WATER INJECTION R-417 WELLHEAD

North Rumaila

9

WELLHEAD PIPING WORK R435

North Rumaila

10

WELLHEAD PIPING WORK FOR R-576

North Rumaila

11

WELLHEAD PIPING WORK FOR R-577

North Rumaila

12

WELLHEAD PIPING WORK FOR RU-009

South Rumaila

13

WELLHEAD PIPING WORK FOR Ru016

South Rumaila

14

WELLHEAD PIPING WORK FOR RU-058

South Rumaila

15

WELLHEAD TIE-IN WORK FOR RU-076

South Rumaila

16

WELLHEAD PIPING WORK FOR Ru097

South Rumaila

17

WELLHEAD TIE-IN WORK FOR RU-432

South Rumaila

18

WELLHEAD PIPING WORK FOR RU-435

South Rumaila

19

WELLHEAD TIE-IN WORK FOR RU-437

South Rumaila

20

WELLHEAD PIPINGWORK FOR RU439

South Rumaila

21

WELLHEAD PIPING WORK FOR RU-440

South Rumaila

22

WELLHEAD PIPING WORK FOR RU-441

South Rumaila

23

WELLHEAD PIPING WORK FOR RU-442

South Rumaila

 

 

FLOW LINES SECTION

 

No.

Project Name

Work Site Location

1

REPLACEMENT FLOWLINE RU076

South Rumaila

2

REPLACEMENT FLOWLINE RU-075

South Rumaila

3

WATER INJECTION R-417 FLOW LINE

North Rumaila

4

WATER INJECTION CPS TIE-IN FLOW LINE R-414

North Rumaila

5

MISHRIF REACTIVATION R-223 FLOW LINE

North Rumaila

6

WATER INJECTION R-147A FLOWLINE

North Rumaila

7

FLOWLINE IU39 TO DS-05

North Rumaila

8

FLOWLINE BV-63 TO DS-10

North Rumaila

 

 

FLEXLINES SECTION

 

No.

Project Name

Work Site Location

1

FLEXLINE FM5/1 TO DS-05

North Rumaila

2

K-44 / 12.7 KM , 24''

North Rumaila

 

 

WATER INJECTION SECTION

 

No.

Project Name

Work Site Location

1

PSV water drain line project

North Rumaila

2

48 INCH PIPING TIE IN FROM NEW TEMPORARY WATER INTAKE SYSTEM TO VEOLIA RAW WATER

North Rumaila

3

Qarmat Ali 48’’ Injection Water Pipeline Leak Repair

North Rumaila

 

 

MANIFOLDS SECTION

 

No.

Project Name

Work Site Location

1

Replacement Field Manifold Tie-In NIDS FM4/2

North Rumaila

2

REPLACEMENT DS TIE-IN RU-076 FL

South Rumaila

 

 

BACO variety of different projects in different places

 

No. Project Name Client work includes Date

1

of Flex line 16» to DS 5 with 7.5 KM

   

2014

2

Fabricating Skids of Wellheads spools 80 nos

   

2014

3

Fabricating 6» spools of Well head 200 Nos

   

2014

4

Manifold / Janubia DS-9/

 

Dressing and Testing of 20- Slot of 38-Slot Manifold manufactured by PEG in Janubia DS. (Project Location: Degassing Station 9),

2013

5

Piping Work of DS-4 ( TK-4 , TK-5 )

 

Tank 104, 105 / DS-4

2013

6

39 Water Injection Lines & Manifolds in North of Rumaila

 

Reinstatement & Piping work for water injection well heads & Manifolds.

2013

7

11 Water Injection lines & manifold in north of Rumaila

 

Reinstatement & Piping work for water injection wellheads & Manifolds

2013

8

Flow Line RU-314 , 2.6 KM, north of Rumaila

 

 

2012

9

Flow Line RU- 388 , 3.4 KM , north of Rumaila

 

 

2012

10

Flow Line RU-390, 3.9 KM north of Rumaila

 

 

2012

11

Flow Line RU-393, 3.7 KM north of Rumaila

 

 

2011

12

Well Head RU-023 , north of Rumaila

 

 

2011

13

of 6›› Flow line 53 KM in AHDEB Oil Field

NY Company CPECC Subcontractor

Cleaning & grading of ROW, Loading and transportation from storages & Stringing, Cutting, beveling, bending of line pipe, welding of line pipe, joint coating,

2010

14

of 16›› Gas Pipeline & 10›› Crude Oil Pipeline 30 KM each in AHDEB Oil Field

BILAD CO. CPECC Subcontractor

Stringing, welding, and lowering only.

2010

15

of 20›› KHORMALAH PS 16KM Pipeline

KAR group in Erbil

Right of way, Stringing, bending, welding, joint coating, excavation, bedding, backfilling.

2010

16

40KM 20›› of crude Oil Pipeline from CPS to Erbil refinery

KAR group

Right of way, Stringing, bending, welding, joint coating, excavation, bedding, backfilling

2009

17

9 KM 6›› Flow line in Khormor Oil Field

Crescent Petroleum & Dana Gas PJSC

Right of way, Stringing, bending, welding, joint coating, excavation, bedding, backfilling & wellhead connection.

2009

18

57KM 24›› Kurdistan Gas Pipeline

KAR group co. Crescent Petroleum & DANA GAS

Cleaning & grading of ROW, Loading and transportation from storages & Stringing, welding of line pipe, joint coating, tie in

2008

19

of Exterior Service trucking road at product Loading Area in LPG Recovery Plant at Khormor Oil Field

Crescent Petroleum & Dana Gas PJSC

 

2008

20

ALFATHA Crossing (Tiger River) 320ML of different Pipeline (40››, 36››, 32››, 30››, 24››, 20››, 16››, 12››, 10››)

A & L Underground Co. Parsons (PIJV)

Welding, Excavation, Concrete Coating, Constructed tow Concrete Manhole Valves on both side of river & Connection.

2006

21

Supply 1300 PC ALASKA BARRIERS to Camp Warior

DALOY Co.

 

2006

22

Delivered 4 Fuel Trucks

KBR in Camp Warrior C7 in Kirkuk.

 

2006

23

Supply Heavy Equipment›s to ALFATHA project

Parsons Iraqi Joint Venture (PIJV)

 

2005